Vessel Operations

 
 
A | a

Operations may be carried out using 3 different berths (3-4-5).            
Drafts ranging from 9 m to 12 m            
570 m total berth length            
6" and 4" fixed pipelines            
 

250 m³ flow rate            
Stainless steel pipelines            
Each tank has separate pipelines from two manifolds            
Gas recycling and scrubber system